Tenderpen drafts your tender, clause by clause.

Upload the specification. Tenderpen splits it into requirements, drafts an answer to each from your own documents, and cites every source.

Request accessHow it works

Private beta. Spain and EU tenders.

Sources in this draft

  1. [1]Company registration and classification certificate, 2025
  2. [2]Staff roster with qualifications, 2025
  3. [3]ISO 9001:2015 certificate, 2024
  4. [4]Fleet and equipment list, 2025
Municipal facility maintenance, lot 2PPT 68 pp.
  • 14 requirements
  • 12 drafted
  • 1 over limit
  • 1 empty
Clause 4.2, its answer, and reference [3]: your 2024 quality certificate.
Req.Clause from the specificationAnswer your draft
4.1

The contractor shall hold current registration in the relevant classification group and provide evidence of at least three years of activity in facility maintenance.

Registered in classification group O, subgroup 1, category 2 since 2019 [1]. Facility maintenance has been the company's sole activity for eleven years; the current staff of 22, with qualifications, is listed in [2].

Criterion
admissibility
Pages
0.4 / 1
4.2

The contractor shall operate a certified quality management system covering the services subject to this contract. Certification shall be valid on the closing date for bids.

The company operates a quality management system certified to ISO 9001:2015, scope: maintenance of building installations. The certificate was issued in 2024 and is valid until March 2027 [3].

Criterion
2.c
Points
5
Pages
0.6 / 1
4.3

The contractor shall describe the transition plan for the first 30 days of the contract, including the staff, vehicles and equipment assigned. Maximum three pages.

Days 1 to 10: site survey and asset inventory alongside the outgoing contractor. Days 11 to 30: preventive schedule loaded and two technicians assigned on site [2]; one van and one lift platform are dedicated to the contract [4]. Handover meetings are held weekly with the facility manager.no source

Criterion
3.b
Points
15
Pages
3.4 / 3
over by 0.4
4.4

The contractor shall provide a preventive maintenance calendar for the climate-control installations listed in Annex II.

No answer yet. Nothing in your documents covers 4.4. Attach a source, or close it as not applicable.

Photograph pending: the desk at eleven, a printed pliego underlined by hand, lit by one lamp. No face.

The specification, at eleven at night.

No consultant. A PDF of 68 pages and last year's memoria.

  1. You underline every shall. One slips past, and the panel excludes you for something you complied with.
  2. Save as, over last year's memoria. The other council's name survives on page 12.
  3. The transition plan allows three pages. Yours runs nine, and every paragraph looks necessary.
  4. The night before, you find a criterion worth 15 points for something you didn't mention.
  5. You lose. Nobody tells you which paragraph did it.

Requirements, sources and limits

One requirement, 4.3 Transition plan, in the three states Tenderpen puts it through: drafted, unsourced, over the limit.

  1. 01Drafted

    4.3 Transition plan, 30 days

    Days 1 to 10: site survey and asset inventory with the outgoing contractor. Days 11 to 30: preventive schedule loaded, two technicians on site [2].

    Criterion
    3.b
    Points
    15

    The clause on the left. Your answer on the right. The source underneath.

    Tenderpen splits the specification into numbered requirements. Each gets its own answer; the empty ones stay visible until you close them.

  2. 02Without a source

    4.3 Transition plan, 30 days

    One van and one lift platform are dedicated to the contract [4]. Handover meetings are held weekly with the facility manager.no source

    Flagged
    1 sentence

    If it isn't in your documents, we say so.

    Every claim carries a numbered reference to the document it came from. Anything without one is flagged, not invented.

  3. 03Over the limit

    4.3 Transition plan, 30 days

    Pages
    3.4 / 3
    Over
    by 0.4

    Three pages means three pages.

    Each answer is written against the scoring criterion and the page limit. Go over, and Tenderpen tells you by how much.

Three steps, one file at the end.

From the PDF you downloaded this morning to the document you upload.

  1. Upload the specification.

    Tenderpen numbers every requirement with its criterion, its points and its page limit.

  2. Attach your documents.

    Certificates, past memorias, staff and fleet lists. Every answer comes from them and cites them.

  3. Export the draft.

    DOCX in the order of the specification, with an index the panel can follow.

The same tender, two ways.

Five rows and no figures. We have measured nothing yet.

Tonight's method compared with Tenderpen, row by row.
RowTonightTenderpen
Reading the specificationYou underline it by hand.Numbered, requirement by requirement.
The draftSave as, over last year's.Written from your documents.
The evidenceYou remember where it was.A reference on the sentence.
The page limitCounted at the end.Counted as you write.
The criteriaFound the night before.On the row from the start.

Priced by the tender.

Two people write the bid; one signs it. The unit is the tender.

  • Solo

    79 €per month · ex. VAT

    1 user

    Two active tenders a month.

  • Team

    249 €per month · ex. VAT

    3 users

    Eight tenders. DOCX with the specification index.

    Most chosen

  • Studio

    590 €per month · ex. VAT

    10 users

    Unlimited tenders, one workspace per client.

Indicative prices. Nothing is on sale yet.

Five questions, before you ask them.

Does Tenderpen submit the bid?
No. It drafts, cites and exports. You read it, you sign it, you submit it.
Where do my documents end up?
On servers in the EU. We use them to draft your answers and for nothing else. They train no model, ours or anyone else's.
Which languages does it draft in?
Spanish and English in the private beta. If your tenders come in Catalan or another EU language, say so when you request access; that answer sets the order.
What happens when I request access?
One email to confirm the address. Then nothing until a seat opens. We ask which tender you have on the table; we don't call.